Fire Damaged Electrical Cable Restoration
Industry: | Commercial Bakery |
Category: | Design, Electrification |
Services: | Electrical Schematics, Design, Cable / Ladder Tray Installation, Cable Installation and Termination |
Description: Fire had caused significant damage to electrical control & power cabling located in underground conduit & ducts.
Pro-Built Control attended an emergency call out to bypass damaged wiring and install temporary power & control. Project restoration works necessitated reverse engineering system operation requirements and associated process control elements.
All field, control and power wiring was traced from point to point to develop working schematics prior to rebuilding/rerouting cable runs.
Duration: 2 days (until startup)
Staff:10
I/O: n/a